The following points highlight the ten main factors affecting the construction of facultative pond. The factors are: 1. Site Selection 2. Pretreatment 3. Construction in Stages 4. Multiple Units 5. Pond Shape 6. Embankment 7. Pond Bottom 8. Inlet Structure 9. Outlet Structure 10. Pond Interconnections. Factor # 1. Site Selection: Facultative pond sites should […]
Construction of Facultative Pond: 10 Factors | Sewage Treatment
Article shared by :
Design of Facultative Pond | Sewage Treatment | Waste Management
Article shared by :
The design the various parameters of the pond may be determined as indicated below: (i) Surface Area: The surface area of the pond may be determined by assuming a suitable value of organic or BOD loading for the pond expressed as kg BOD5/hectare/day. Since the amount of oxygen that can be produced by photosynthesis and […]